Skip to article
창간37주년, 수원일보의 새로운 이름
News S
Search news
Weekly edition

아직 등록된 주간 지면이 없습니다. 발행된 지면이 등록되면 이곳에서 확인하실 수 있습니다.

신문 구독 문의

122-Space Gwonseon 1-dong Public Parking Lot Completed...Transitions to Paid Operation on December 14

Suwon Special City, Gwonseon 1-dong Public Parking Lot Completed Accommodating 122 Vehicles...Free Trial Operation Begins November 23
Suwon Special City Mayor Lee Jae-jun (fifth from right) and other attendees of the completion ceremony are cutting the ribbon. /Suwon City

The 'Gwonseon 1-dong Public Parking Lot,' capable of accommodating 122 vehicles, has been completed at 1166 Gwonseon-dong, Gwonseon-gu, Suwon, significantly alleviating parking shortages in the area.

Suwon Special City (Mayor Lee Jae-jun) invested a total project cost of 6.7 billion won to construct the facility on the former site of Gwonseon 1-dong Administrative Welfare Center, with a gross floor area of 4,507.03 square meters and five stories above ground. Construction began in July 2025 and was completed in October.

The city held a completion ceremony for the parking lot on the 17th, attended by Suwon Special City Mayor Lee Jae-jun and Suwon City Council Vice-chair Yu Gwang-jae, among others.

Suwon Special City Mayor Lee Jae-jun stated, "With the completion of the Gwonseon 1-dong Public Parking Lot, a long-cherished aspiration of residents, we hope to reduce inconvenience for residents and bring vitality to the local commercial district. We will continue to pursue residential-focused parking policies that citizens can experience in their daily lives."

The Gwonseon 1-dong Public Parking Lot applied a patented construction method (long-span beam), a new technology. By minimizing pillars between parking spaces and aisles, it increases openness and reduces construction costs. The design also features convenient vehicle entry and exit as well as parking, reducing so-called 'door-ding' accidents.

Suwon Special City, Gwonseon 1-dong Public Parking Lot Completed Accommodating 122 Vehicles...Free Trial Operation Begins November 23
Gwonseon 1-dong Public Parking Lot at 1166 Gwonseon-dong, Gwonseon-gu, Suwon City. /Suwon City

For the first time among Suwon City's public parking lots, a roof has been installed in the rooftop parking area, protecting vehicles parked on the roof from rain, snow, and strong sunlight.

Solar power generation equipment with a capacity of 44.64kW has been installed on the roof. It is expected to reduce carbon emissions by 25-30 tons annually and save approximately 12 million won in electricity costs.

The Gwonseon 1-dong Public Parking Lot will be operated by Suwon Urban Development Corporation and will operate free of charge from November 23 to December 13 as a trial, then transition to paid operation from December 14. Parking rates are set at no charge for the first hour, followed by 300 won per 10 minutes, with a maximum daily rate of 7,000 won. Monthly passes are available at 60,000 won for daytime, 40,000 won for nighttime, and 70,000 won for all-day use.

Send a news tip to Suwon IlboYour tip becomes the news · Your identity is protectedSend tip

Was this article helpful?

Comments —

Leave blank to appear as a reader.

All comments

Loading comments…