Suwon Water Supply Business Division Resumes Water Supply Construction Applications from the 24th
[Suwon Ilbo=Reporter Jung Jun-sung] The Suwon Water Supply Business Division announced on the 21st that it will resume accepting applications for water supply construction work starting from the 24th, which had been suspended to prevent poor quality work due to lower temperatures during winter.
Water supply construction work involves connecting water pipes branched from distribution pipes to water meters in order to supply water to residences, commercial buildings, and other facilities that require water supply.
There are ‘new installation’ where water supply equipment (equipment that supplies water) is installed in areas without water supply, ‘water outlet separation’ where water supply equipment in the same building is separated, ‘modification’ where the location of water supply equipment is changed, and ‘expansion’ where the amount of water supply is increased.
Applications can be made by phone (031-228-4933), fax (031-228-3734), or in-person visit (119 Gwanggyo-san-ro, Jangan-gu, Suwon Water Supply Business Division). For detailed information including application forms, visit the Suwon Water Supply Business Division website (https://water.suwon.go.kr) and select ‘Water Supply Information → Water Supply Construction Application Guide’.
A city official stated, “By resuming water supply construction work, we will stably supply clean and safe tap water to citizens,” and added, “We will do our best so that citizens can use tap water with peace of mind.”




Đang tải bình luận…