Ministry of Environment Announces Drafting of Enforcement Ordinance and Rules for Construction Waste Recycling Promotion Act
The Ministry of Environment announced on Wednesday, the 13th, the draft enforcement ordinance and rules for the Construction Waste Recycling Promotion Act as a follow-up measure to the enactment and promulgation of the act (December 31, 2003), following consultations with related government agencies.
The draft provisions specify matters delegated to subordinate legislation in the act and matters necessary for its implementation, including the recycling purposes of construction waste, the scope of construction projects requiring mandatory use of recycled aggregate, and the evaluation of service performance capabilities of construction waste treatment operators.
The draft announcement will be published in the Government Gazette and on the Ministry of Environment's website, and opinions will be collected from the public for 20 days. Following this, the final provisions will be confirmed and reviewed by the Regulatory Reform Committee and the Ministry of Government Legislation before implementation beginning in January of next year.
<Key Contents>
▶The purposes of recycled aggregate have been specified as road base layer, concrete, asphalt concrete, frost prevention layer, road surface, road embankment, backfill and refilling, earth fill for land modification, and cover material for landfill facilities, etc.
▶The scope of construction projects mandating the use of recycled aggregate has been designated as road construction (1 km or longer), industrial park site development (150,000 ㎡ or larger), environmental infrastructure installation, sewerage line maintenance (1 km or longer), parking lot installation (1,000 ㎡ or larger), urban and residential environment improvement, and multi-family housing construction, etc.
☞Specific matters regarding the usage amount and ratio of recycled aggregate shall be jointly announced by the Ministry of Environment and the Ministry of Construction and Transportation, taking into comprehensive consideration the supply and demand situation of recycled aggregate, the production technology level of recycled aggregate, and quality standards by use of recycled aggregate.
▶In order to enable construction waste generators to select qualified treatment operators, evaluation methods for service performance capabilities of construction waste treatment operators and procedures for public announcement of evaluations have been established.
▶Among construction projects subject to the Act on Contracts with the State as a Party, the target projects for separate bidding or divided implementation methods of construction projects and construction waste treatment services have been set at construction projects with construction waste generation of 5 tons or more, as specified in the current Waste Management Act.
☞The Ministry of Construction and Transportation and the Korea Construction Association are currently requesting that the target scale for separate bidding, etc., be set at projects generating 10,000 tons or more of construction waste. Consultation will continue during the legislative process.
▶The existing waste management provisions relating to construction waste have been revised and reflected in the draft provisions, and the following new provisions have been added to address current issues related to the treatment and recycling of construction waste.
-Waste generated after intermediate treatment of construction waste shall be regarded as newly generated construction waste and classified and stored as targets for recycling, incineration, and landfilling, etc.
-Construction waste treatment operators that collect, transport, and treat construction site general waste shall prepare notification from the generator and simplified transfer certificates.
☞The Ministry of Construction and Transportation is requesting that the intermediate treatment standards for construction waste materials (waste concrete, waste asphalt concrete) under the current Waste Management Act (maximum particle size of 100 mm or less, foreign matter content of 1% or less) be specified in the recycled aggregate quality standards to be set by the Minister of Construction and Transportation. Consultation will continue during the legislative process.
▶Procedures and methods for the establishment and operation of a construction waste treatment association (tentative name) have been specified to ensure quality of recycled aggregate and promote the development of the construction waste treatment industry.
▶Unified detailed standards for qualification review of construction waste treatment services have been established to enable project owners to select qualified operators for construction waste treatment.
☞The existing detailed qualification review standards applied to the Ministry of Environment and its affiliated agencies shall be expanded to all applicable institutions under the Act on Contracts with the State as a Party.
▶Additionally, specific provisions have been established regarding the formulation of basic recycling plans for construction waste, recycling statistical surveys, and the establishment of information management systems.




Loading comments…