Gwonseon-gu Agricultural Water Channel Maintenance Project Implemented
Suwon NewsPublished 2013.04.04 14:39
Gwonseon-gu (District Chief Kim Jeong-su) announced on the 4th that it has implemented an "agricultural water channel maintenance project" to ensure stable farming as the main farming season begins.
To prevent farmland erosion, burial, and crop flood damage that can occur due to heavy summer rains in advance and to promote smooth supply of agricultural water to realize timely farming operations, the district provided three pieces of heavy equipment to three water management associations within the jurisdiction to support the removal of sediment from pumping stations and the removal of deposits from agricultural water channels.
In addition, seven agricultural water channels totaling 1.9km in the Dangsu-dong and Gosaek-dong areas that were buried or washed away by heavy rains last year were maintained, and a flume pipe installation project was completed by investing 32 million won in a 210-meter earthwork-structured agricultural water channel at 14-12 Gosaek-dong.
A district official stated, "Going forward, we have decided to continuously promote agricultural infrastructure maintenance to provide farming convenience for local farmers and to prevent crop flood damage in advance and supply stable agricultural water,"
Send a news tip to Suwon IlboYour tip becomes the news · Your identity is protectedSend tipTo prevent farmland erosion, burial, and crop flood damage that can occur due to heavy summer rains in advance and to promote smooth supply of agricultural water to realize timely farming operations, the district provided three pieces of heavy equipment to three water management associations within the jurisdiction to support the removal of sediment from pumping stations and the removal of deposits from agricultural water channels.
In addition, seven agricultural water channels totaling 1.9km in the Dangsu-dong and Gosaek-dong areas that were buried or washed away by heavy rains last year were maintained, and a flume pipe installation project was completed by investing 32 million won in a 210-meter earthwork-structured agricultural water channel at 14-12 Gosaek-dong.
A district official stated, "Going forward, we have decided to continuously promote agricultural infrastructure maintenance to provide farming convenience for local farmers and to prevent crop flood damage in advance and supply stable agricultural water,"
© Suwon Ilbo. Unauthorized reproduction and redistribution prohibited.




Loading comments…