Korea Railroad Says General Train Service on Gyeongbu Line to Resume from First Train on 22nd

Korea Railroad Corporation (Korail) announced on the 21st that it will resume general train service on the Gyeongbu Line, which had been halted due to a cargo train derailment, starting with the first train on the 22nd.
According to Korail, at approximately 5:37 a.m. that day, cargo train No. 3810 entering Sojeongni Station on the Gyeongbu Line in Sojeong-myeon, Sejong City, engaged automatic emergency braking and derailed. Of the total 21 cars, 5 cars derailed—2 from the front and 3 from the rear. There were no casualties.
As the derailed train struck a steel beam supporting the overhead catenary line beside the track, the catenary line was severed, cutting off power supply to the Cheonan-Jeonjui section. As a result, general train service on the Gyeongbu Line between Cheonan and Daejeon—including ITX-Maum, Saemaul, and Mugunghwa trains—was completely halted. KTX using the high-speed line and trains on the Chungbuk Line operated normally.
With major university entrance essays scheduled on the day of the accident, Korail, concerned about inconvenience to test-takers, urgently deployed 15 emergency KTX and ITX trains and guided passengers through disaster text messages to use high-speed trains or other transportation options.
Korail plans to normalize general train service starting with the first train on the 22nd once work including overhead catenary line restoration is completed. With the Gyeongbu Line general trains passing through Suwon Station, inconvenience for passengers in southern Gyeonggi Province, including Suwon, is expected to be resolved.




Loading comments…